Skip to content
Clean Margin Desk

Methodology / worked examples

Clean Margin Desk guide

A recurring bid is easier to audit when area scope, visit frequency, labor production, payroll burden, travel, supplies, and overhead stay visible. This worksheet calculates a target price and then compares a measured labor month to the same contract price.

1. Build labor from the scope

For each area, multiply square feet by visits per month and operator-entered minutes per 1,000 square feet. Add travel hours once per visit. Burdened labor applies payroll burden to wage cost.

Labor hours = (sqft ÷ 1,000 × minutes ÷ 60 × visits) + (travel hours × visits)

2. Price to a margin target

Direct labor, supplies, travel, and the monthly overhead allocation form estimated monthly cost. A target contribution margin is applied to the whole monthly cost, not added as a markup percentage.

Suggested bid = monthly cost ÷ (1 − target margin)

3. Close the estimate loop

After a measured month, enter actual labor hours. A higher actual hour count lowers actual margin even when the invoice stays fixed. Investigate access, scope creep, travel, and production assumptions before changing a wage or margin target.

If a $2,850 contract costs $2,100 in the entered scenario, actual margin is (2,850 − 2,100) ÷ 2,850 = 26.3%.

Limits and assumptions

Sources and further reading

Open the tool